top of page
Doing it the "Wright" Way since 1984!
(802) 259-2094
Mount Holly, Vermont USA
Quechee Covered Bridge
Construction on new timber framed structure that sits on a concrete bridge. Roof trusses and side walls were prefabricated in a nearby field and installed using a crane in order to facilitate assembly time. This bridge replaced a bridge damaged in Tropical Storm Irene.
Out of gallery
bottom of page