top of page
Doing it the "Wright" Way since 1984!
(802) 259-2094
Mount Holly, Vermont USA
This project consisted of emergency repairs to three of the roof trusses after cracks were discovered in the plaster ceiling. Repairs included replacing rotten and broken timbers with new wood and adding over 20,000 lbs of steel plate, bolts and tension rods to the three trusses to bring them up to new code requirements for snow loading. This project began the last week of June and had to be completed in a short time frame to ensure the theatre could open for a sold out event just after Labor Day.
bottom of page