Lake Ninevah Dam

The existing dam face was severely weathered and fissured and in need of repair. The dam was re-faced with new concrete on both sides to repair the existing face and add 2’ of freeboard.  The stop was replaced, the sluiceway was repaired, the principal spillway was overlaid with new concrete and an additional set of stop log guides were installed. The existing foot bridge over the spillway was also improved to incorporate handrails and short sections of fence along both sides of the spillway.

31 Station Rd, Mt Holly, VT 05758, USA

Phone: (802) 259-2094

Fax: (802) 259-2689

©2020 by Wright Construction Co Inc. All rights reserved.

  • Houzz
  • Instagram